WA Pass road clearing started March 22
- Scotsman
-
Topic Author
- User
-
Less
More
15 years 10 months ago #191012
by Scotsman
WA Pass road clearing started March 22 was created by Scotsman
According to the WSDOT website, annual road clearing operations started on March 22nd.
Given low snow conditions an early opening should be expected.
Anybody in the group collective got any forecasts or better information as to when????????????????????
Given low snow conditions an early opening should be expected.
Anybody in the group collective got any forecasts or better information as to when????????????????????
Please Log in or Create an account to join the conversation.
- Joedabaker
-
- User
-
Less
More
- Posts: 1012
- Thank you received: 0
15 years 10 months ago #191015
by Joedabaker
Replied by Joedabaker on topic Re: WA Pass road clearing started March 22
Ohhhh Grreat Seeker of Knowledge.....(Bugs Bunny says with towel around his head)
What's the over/under on this one?
I'm hearing two weeks, depending on snow, so my guess April 9th..
What's the over/under on this one?
I'm hearing two weeks, depending on snow, so my guess April 9th..
Please Log in or Create an account to join the conversation.
- Scotsman
-
Topic Author
- User
-
Less
More
- Posts: 2432
- Thank you received: 0
15 years 10 months ago #191017
by Scotsman
See this post from another scource.
You can sign up for updates. Me thinks sooner.... I'm going for Friday April 2nd!
Sign up:
Hi all,
By this afternoon, the crew had the highway from the Silver Star gate (MP 171) to Lone Fir Campground (MP 166) cleared and widened. They had hoped to have a single cut through to Cutthroat Ridge (MP 168), but the 2nd snow blower that was supposed to join the effort today didn't show up. It's in the shop in Wenatchee because it wouldn't start. Repairs have been completed and it's headed for Twisp tomorrow, but won't be on site and working until late Wednesday or Thursday morning. Tomorrow, the crew is expecting to clear and widen all the way to Cutthroat #1 (the beginning of the avalanche zone) where the Avalanche crew will join them on Thursday morning (along with their snow cat/plow). If we don't have any more equipment or weather delays, they're hoping to clear the highway through the 12 Cutthroat Ridge avalanche chutes by Tuesday (which would be record time!). That would put them into the Spiral Gulch/Liberty Bell section sometime Wednesday. (We'll see...)
Don (Becker) says the weather was great today. After starting out cold (about 23 degrees at 7 a.m.) it turned sunny and got up to 50 degrees by 3 p.m.
Check out the pictures from day 1 on flickr: www.flickr.com/photos/wsdot/s...7623371473447/
Expect another update late Wednesday or early Thursday.
Jeff Adamson 509-667-2815 adamsoj@wsdot.wa.gov
You are subscribed to North Cascades Highway for WSDOT. This information has recently been updated, and is now available.
Replied by Scotsman on topic Re: WA Pass road clearing started March 22
Ohhhh Grreat Seeker of Knowledge.....(Bugs Bunny says with towel around his head)
What's the over/under on this one?
I'm hearing two weeks, depending on snow, so my guess April 9th..
See this post from another scource.
You can sign up for updates. Me thinks sooner.... I'm going for Friday April 2nd!
Sign up:
Hi all,
By this afternoon, the crew had the highway from the Silver Star gate (MP 171) to Lone Fir Campground (MP 166) cleared and widened. They had hoped to have a single cut through to Cutthroat Ridge (MP 168), but the 2nd snow blower that was supposed to join the effort today didn't show up. It's in the shop in Wenatchee because it wouldn't start. Repairs have been completed and it's headed for Twisp tomorrow, but won't be on site and working until late Wednesday or Thursday morning. Tomorrow, the crew is expecting to clear and widen all the way to Cutthroat #1 (the beginning of the avalanche zone) where the Avalanche crew will join them on Thursday morning (along with their snow cat/plow). If we don't have any more equipment or weather delays, they're hoping to clear the highway through the 12 Cutthroat Ridge avalanche chutes by Tuesday (which would be record time!). That would put them into the Spiral Gulch/Liberty Bell section sometime Wednesday. (We'll see...)
Don (Becker) says the weather was great today. After starting out cold (about 23 degrees at 7 a.m.) it turned sunny and got up to 50 degrees by 3 p.m.
Check out the pictures from day 1 on flickr: www.flickr.com/photos/wsdot/s...7623371473447/
Expect another update late Wednesday or early Thursday.
Jeff Adamson 509-667-2815 adamsoj@wsdot.wa.gov
You are subscribed to North Cascades Highway for WSDOT. This information has recently been updated, and is now available.
Please Log in or Create an account to join the conversation.
- tomq
-
- User
-
Less
More
- Posts: 28
- Thank you received: 0
15 years 10 months ago #191019
by tomq
Replied by tomq on topic Re: WA Pass road clearing started March 22
It looks like the link is broken. Try this one:
www.flickr.com/photos/wsdot/sets/72157623371473447/
Cools shots of hoar frost crystals.
www.flickr.com/photos/wsdot/sets/72157623371473447/
Cools shots of hoar frost crystals.