Home > Forum > Categories > Random Tracks > Ptarmigan Traverse on a tight schedule?

Ptarmigan Traverse on a tight schedule?

  • Pete A
  • Topic Author
  • User
  • User
More
21 years 9 months ago #169263 by Pete A
Replied by Pete A on topic Re: Ptarmigan Traverse on a tight schedule?
thanks Tim, hadn't heard anything about that washout...looks like a temporary fix has already been put in place so it is driveable through that wash-out.<br><br> www.fs.fed.us/r6/mbs/projects/flood-dama...uiattle-repair.shtml

Milepost (MP) 14.4 – T32N, R11E, Section 14 (before the Huckleberry Trailhead).
Damage: High river flow washed out 330 feet of roadway. Temporary access has been built adjacent to the washout, and is currently driveable.
Proposed Repair: Relocate the road away from the river for about 600 feet and relocate the Huckleberry Trail and parking just beyond the washout.

Please Log in or Create an account to join the conversation.